Shelby Township Building Department | Permits, Inspections & Official Contact

Shelby Township permit action guide

Choose the Correct BS&A Permit Route, Upload the Township Worksheets and Protect the 180-Day Permit Clock

Shelby Township uses BS&A Online for homeowner and contractor applications, inspection requests, payments, permit searches and inspection results. Some Township forms can be completed online, while other project documents must be downloaded, completed and added to the application or presented to the Building desk.

This guide explains which permit is required, what plans and county approvals must be prepared, how the September 2025 fee schedules work, when a gas-sizing worksheet blocks inspection scheduling and how to complete grade, trade and final inspections before the initial 180-day permit period expires.

Homeowner and contractor BS&A workflows
Current codes, fee schedules and permit clock
Plot plans, grade certificates and inspections
Shelby Township building plan moving through BS&A review to final inspection An animated house plan, BS&A dashboard, oak tree, rolling landscape and final inspection approval represent the Shelby Township permit process. PLOT + CONSTRUCTION PLANS ZONING • GRADING • TRADES • TREES BS&A PERMIT REVIEW ISSUED WORKSHEET FINAL INSPECTION CLOSED 180 DAYS
BS&A
Use the correct online doorway Shelby Township publishes separate BS&A routes for homeowners and contractors. The Township also provides online inspection requests, permit payments and public permit/inspection-result searches.
180
Permit clock changed September 1, 2025 All permits begin with an initial 180-day validity period. Do not wait until the end of the period to request the first inspection or ask about renewal.
GAS
A missing gas-sizing worksheet can stop inspection scheduling For gas piping, tankless water heaters, generators, pool heaters and tankless or combination boilers, the Township requires its Revision 06/2025 Gas Pipe and Gas Meter Sizing Worksheet to be complete and on file before an inspection is scheduled.
Start here

Choose the Shelby Township Task You Need

Official contact panel

Shelby Township Building Department Phone, Email, Address and Hours

Building Department 586-731-5969 Permits, inspections and plan review
Building email building@shelbytwp.org Include address and permit number
Fax 586-803-2099 Confirm before sending time-sensitive forms
Office location Township Hall, Upper Level 52700 Van Dyke Ave.
Mailing location Shelby Township, MI 48316 Confirm original-document requirements
Office hours 8:30 AM–5:00 PM Monday through Friday
Planning and Zoning 586-726-7243 planning@shelbytwp.org
Public Works 586-731-5990 Water and sewer coordination
Use a useful email subject: “Permit route – 123 Example Drive – 600 sq ft addition.” Include the parcel number, project type, estimated valuation, trade work, septic or sewer status and whether the property is within a subdivision.
Jurisdiction and parcel check

Confirm the Property and Outside Agencies Before Preparing Plans

Township parcel

Verify the street address, parcel ID, subdivision or business name and lot number before filing. Similar Shelby-area mailing addresses can create record-search mistakes.

County roads and approaches

Road approaches and work affecting county road right-of-way can require Macomb County Department of Roads approval in addition to the Township permit.

Well, septic and soil erosion

Projects without municipal utilities or involving substantial earth disturbance can require Macomb County Health or soil-erosion approval before Township issuance.

Subdivision approval is separate from Township approval. A permit does not override private deed restrictions, easements or homeowners-association rules.
BS&A workflow

Use the Online Permit System Without Splitting the Project

Homeowner application

  1. Open the homeowner permit route.
  2. Locate the property.
  3. Select the closest permit type.
  4. Complete owner and project information.
  5. Upload required forms and plans.
  6. Sign the homeowner affidavit when applicable.

Contractor application

  1. Log in to the BS&A contractor account.
  2. Confirm the license and registration are current.
  3. Choose the property and permit type.
  4. Enter all equipment, fixtures and valuation items.
  5. Upload plans and worksheets.
  6. Monitor fees and review comments.

After submission

  1. Save the application number.
  2. Pay only through the linked permit record.
  3. Read all review notes.
  4. Upload corrections to the original application.
  5. Wait for formal issuance.
  6. Use the same permit for inspection requests.
NO DUP
Do not create a second permit to fix the first one Duplicate applications can divide drawings, payments and inspection history. Use the existing record’s resubmittal or document-upload function.
Permit finder

Match the Project to the Correct Shelby Township Route

Project
Primary route
Important extra requirement
New single-family home
Building + zoning plan review
Four plot plans, three construction-plan sets, tree permit, energy worksheet, grade certificates and county approvals
Residential addition
Building permit
Zoning setbacks, construction plans, energy worksheet and separate trade permits
Finished basement
Building permit
Egress, smoke/CO alarms, framing, electrical, mechanical and plumbing scope
Deck
Building permit
Plot plan, setbacks, footing design, ledger, guards, stairs and easements
Accessory building over 200 sq ft
Building + zoning permit
Plot plan, construction drawings, setbacks, drainage and septic separation
Detached accessory building 200 sq ft or less
Zoning compliance permit
Township procedure calls for three plot-plan copies even though a building permit is not required
Fence
Fence permit
Fence ordinance agreement, property lines, easements and subdivision restrictions
Pool, hot tub or spa
Building + trade permits
Barrier, alarm affidavit, hydraulic worksheet, equipment location, electrical bonding and possible bond
Generator or gas equipment
Mechanical + electrical permits
Current gas-pipe/meter worksheet and equipment-placement acknowledgement before inspection
Demolition
Building demolition permit
Three site-plan copies, utility disconnects, soil-erosion approval, open-hole and final inspections
Commercial alteration or new business
Zoning/site plan + building permits
Use approval, accessibility, Fire, special inspections, sign and Certificate of Zoning Compliance
Public sidewalk work
Sidewalk permit
Township sidewalk standards, inspection and possible deferral documents
Application workflow

Apply for a Shelby Township Permit in Eight Steps

Confirm zoning and private restrictions

Check setbacks, easements, permitted use, lot coverage, tree rules, subdivision restrictions and septic-system location before finalizing the project.

Choose the complete permit route

Identify Building, electrical, mechanical, plumbing, fence, sidewalk, sign, Fire, tree and county permits that apply to the full scope.

Download the Township procedure sheet

Use the project-specific outline for new homes, additions, decks, fences, basements, demolition, pools, signs or accessory buildings.

Prepare the plot plan and construction documents

Show all required dimensions, structures, easements, utilities, grades, drainage and construction details. Use the Township’s required copy count for the project.

Complete owner, contractor and professional information

Enter the owner, licensed contractor, workers’ compensation, architect or engineer and detailed project information accurately.

Submit through the correct BS&A account

Use the homeowner route only for qualifying work personally performed at the owner’s residence. Contractors should use the contractor account.

Pay application, plan-review, permit and bond charges

Review each line before paying. Trade permits and performance bonds are separate from the main Building permit.

Wait for issuance before construction

Do not begin because an application was accepted or payment was made. Start after the permit is formally issued and keep the approved documents on site.

Plan-package checklist

Prepare Documents That Match the Township Review

Application information

  • Street address
  • Parcel ID
  • Lot or building number
  • Subdivision or business name
  • Owner information
  • Detailed project type
  • Estimated construction value
  • Proposed use

Plot-plan information

  • Lot dimensions
  • Property description
  • Existing and proposed buildings
  • Zoning setbacks
  • Recorded easements
  • Roads and right-of-way
  • Existing and proposed utilities
  • Existing trees

Construction information

  • Foundation plan
  • Floor plans and room uses
  • Exterior elevations
  • Building sections
  • Framing details
  • Energy worksheet
  • Trade plans when required
  • Special-inspection statement
Plot-plan drainage matters. Show proposed drainage arrows, downspouts, sump-pump discharge, adjacent grades, benchmark, north arrow and drawing scale. The plan must not direct stormwater onto neighboring property except through an approved drainage system.
New-home checklist

Current Single-Family Procedure Has Exact Copy and Grade Requirements

Application fee

$250

Listed on the single-family procedure revised September 2025.

Plot plans

Four copies

Include grading, drainage, utilities, trees and zoning information.

Construction plans

Three copies

Foundation, floors, elevations, sections and construction details.

Review target

At least two weeks

A complete submission is required before the estimate is meaningful.

New-home milestone
What must happen
Why it matters
Tree permit
Obtain before the building permit unless a subdivision tree permit already covers the lot
Tree and woodland preservation is administered locally
County approvals
Provide soil erosion, well/septic and road-approach approvals when applicable
Township issuance does not replace county jurisdiction
Water and sewer
Complete the required DPW application and pay applicable fees
Utility approval may be an issuance condition
Preliminary grade certificate
Submit and obtain approval before requesting the garage-footing inspection
Confirms house location and preliminary grading
Final grade certificate
Submit and obtain approval before final Building inspection
Confirms completed site grading and drainage
Large house plans
Architect- or engineer-sealed plans for houses exceeding 3,500 square feet
Meets the Township’s published professional-design requirement
Small accessory buildings

A Shed of 200 Square Feet or Less Still Needs Zoning Approval

Published permit route

  • A Building permit is not required for a qualifying detached residential accessory building of 200 square feet or less.
  • The property owner must obtain a Zoning Compliance Permit.
  • The Township procedure calls for three plot-plan copies.
  • Allow review time before ordering delivery or preparing a pad.

Published location rules

  • Do not place the building in the front yard.
  • Provide at least five feet from a side or rear property line.
  • Do not place it within an easement.
  • Maintain at least ten feet from a septic system unless the Health Department approves otherwise.
  • Provide at least ten feet between accessory buildings on adjoining parcels.
Do not rely on the “under 200 square feet” rule alone. Electrical, plumbing or mechanical work, nonresidential use, business use, easements, drainage problems or subdivision restrictions can change the approval route.
Current construction codes

Use the Michigan Code Edition Listed for Each Discipline

Discipline
Township-listed code
Effective date
Residential
2015 International Residential Code with Michigan amendments
February 8, 2022
Building
2021 International Building Code with Michigan amendments
April 9, 2025
Rehabilitation
2021 International Existing Building framework with Michigan amendments
April 9, 2025
Residential energy
2015 Michigan residential energy provisions incorporated into the Residential Code
February 8, 2022
Electrical
2023 National Electrical Code with Michigan amendments
March 12, 2024
Mechanical
2021 International Mechanical Code with Michigan amendments
March 12, 2024
Plumbing
2021 International Plumbing Code with Michigan amendments
March 12, 2024
Commercial energy
2021 International Energy Conservation Code with Michigan amendments
April 22, 2025
The application date controls. Projects submitted on or after a code’s effective date are reviewed under that adopted edition and the applicable Township ordinances.
Contractor and homeowner responsibility

Use the Correct License or Sign the Full Homeowner Affidavit

Licensed contractor route

  • Residential builder or maintenance license
  • Electrical contractor license
  • Mechanical contractor license
  • Plumbing contractor and master-plumber details
  • Current Township registration
  • Workers’ compensation information

Homeowner permit route

  • The homeowner must personally qualify for the exemption.
  • The affidavit states that the work is performed by the homeowner at the home in which the homeowner lives or is about to occupy.
  • Work cannot be concealed, covered or placed into operation before inspection and approval.
  • The homeowner accepts responsibility for arranging inspections and code compliance.
Do not use a homeowner permit to shield an unlicensed contractor. Michigan law prohibits arrangements intended to evade contractor licensing requirements.

Verify a Michigan License

Effective September 1, 2025

Understand the Current Shelby Township Permit Fee Layers

Trade minimum

$75

Electrical, mechanical and plumbing schedules each list a $75 minimum permit fee.

Application fee

$50

Added to the applicable electrical, mechanical or plumbing permit charges.

Online fee

$2

Added when the trade permit is submitted online.

Contractor registration

$15

Listed for electrical, mechanical and plumbing contractors.

Select an item to estimate the online trade-permit starting amount.

Estimate assumes the $75 minimum permit fee, $50 application fee and $2 online fee. It excludes other circuits, fixtures, plan review, registration, Building permit, Fire review, bond and consultant charges.

Estimated online starting amount $0 The BS&A invoice is the controlling amount.
Current fee rule
Published amount
Practical meaning
Trade plan review
0.00035 of construction value; $75 minimum
Applied when electrical, mechanical or plumbing plan review is required
Included reviews
Initial review + one re-review
Each additional review is listed at $75
Consultant review
Consultant cost + 25%
Can apply when the Building Official determines outside review is necessary
Work not ready
$75
Charged when an inspector arrives and the work is not ready
First reinspection of original violations
No charge
Applies to the first return for listed original corrections
Additional reinspection
$75
Can apply after the first reinspection
180-day trade renewal
50% of original permit; $500 maximum
Subject to reasonable progress and no 180-day suspension or abandonment
Cancellation processing
$50
Plan-review fees and work completed affect the refundable amount
Building and performance-bond amounts are separate. Use the Township’s current September 2025 Building Permit Fee Schedule and Performance Bond Schedule rather than assuming the trade-fee formula applies to the main construction permit.

Open All Current Fee and Bond Schedules

Gas equipment gate

Complete the Revision 06/2025 Gas Worksheet Before Requesting Inspection

Projects covered

  • New gas piping
  • Tankless water heaters
  • Generators
  • Pool heaters
  • Tankless boilers
  • Combination boilers

Prepare these details

  • Existing meter information
  • Total connected BTU load
  • Pipe material
  • Pipe length
  • Individual appliance input
  • Requested meter capacity
BLOCK
Old versions are not accepted for new submissions The Township states that Revision 06/2025 must be complete and on file before inspections are scheduled for the listed equipment.

Open the Current Gas Sizing Worksheet

Inspection workflow

Request the Inspection Only After the Permit and Work Are Ready

Confirm the permit is issued and active

Use BS&A to verify the permit number, status, address and remaining inspection types.

Complete prerequisite documents

Upload gas-sizing worksheets, grade certificates, special-inspection reports or other required documents before selecting the inspection.

Submit the online inspection request

Select the correct permit and exact inspection stage. Save the confirmation and do not assume a preferred date is confirmed until the system accepts it.

Provide safe access

Include the responsible contact, phone number, gate or lockbox instructions and any occupied-unit coordination.

Keep regulated work visible

Do not pour concrete, backfill, insulate, drywall, conceal wiring or piping or operate new equipment before the required approval.

Review the posted result

Use the BS&A result search. Correct every listed item before requesting reinspection.

Building inspections

  • Footing
  • Foundation
  • Rough framing
  • Insulation
  • Final Building

Trade inspections

  • Electrical rough and final
  • Mechanical rough and final
  • Plumbing underground, rough and final
  • Gas test and final

Project-specific inspections

  • Pool and barrier
  • Open-hole demolition
  • Fence or sidewalk
  • Grade and location
  • Special inspections
A “work not ready” visit is listed at $75. Confirm labor, testing, ladders, access, approved plans and prerequisite inspections before submitting the request.

Request an Inspection

Permit expiration control

Protect the Initial 180-Day Permit Period

Permit issued
Begin authorized work
Request required inspection
Maintain reasonable progress
Request renewal before lapse
Complete final inspection

Track the issuance date

Save the permit and calendar the 180-day date immediately. Do not depend on a contractor or portal reminder.

Document progress

Keep inspection results, photographs, invoices and correspondence showing that work is continuing.

Ask before expiration

Contact the Building Department while the permit is active to confirm eligibility, renewal fee and required written explanation.

Trade schedule rule: Electrical, mechanical and plumbing permits can be renewed for additional 180-day periods when reasonable progress continues and the work has not been suspended or abandoned for 180 days.
Special project workflows

Extra Requirements for Demolition, Pools, Fences and Commercial Work

Demolition

  • Submit a Building permit application.
  • Provide three site-plan copies.
  • Verify electric, gas, water, sewer and communication disconnects.
  • Obtain soil-erosion approval when required.
  • Request an open-hole inspection after foundation material is removed.
  • Complete final grading and debris removal before final inspection.

Pools, hot tubs and spas

  • Use the correct aboveground, inground, hot-tub or spa route.
  • Provide the pool alarm affidavit or safety-cover request when applicable.
  • Submit the hydraulic worksheet when required.
  • Show setbacks, equipment and overhead or underground utility conflicts.
  • Obtain Building, electrical, plumbing and mechanical permits as applicable.
  • Do not use the pool before barrier and final approvals.

Fences and easements

  • Submit the fence application and ordinance agreement.
  • Identify actual property lines.
  • Show easements and corner visibility.
  • Check subdivision restrictions.
  • Do not treat the Township permit as private easement consent.

Commercial or industrial

  • Confirm zoning use and site-plan status first.
  • Coordinate Building, Fire and trade plan review.
  • Prepare accessibility and energy documents.
  • Submit a Statement of Special Inspections when applicable.
  • Obtain sign and Certificate of Zoning Compliance approvals.
Planning, trees and infrastructure

Building Approval Does Not Replace Land-Use or County Review

Issue
Possible approval
Start with
Commercial development or major site change
Site-plan review
Shelby Township Planning and Zoning
Use requiring discretionary approval
Special land use
Planning Commission process
Dimensional hardship or zoning appeal
Zoning Board of Appeals
Planning and Zoning
Permanent commercial sign
Planning sign application + Building/electrical permits
Planning and Zoning
New house or regulated woodland impact
Tree permit
Planning and Zoning or Building
Water or sewer connection
DPW application and fees
Shelby Township Public Works
Well or septic system
County Health permit
Macomb County Health Department
County road approach
Approach or right-of-way permit
Macomb County Department of Roads
Earth disturbance or demolition
Soil-erosion permit
Responsible Macomb County agency
Mapped floodplain
Floodplain documentation or permit
Shelby Township Building Department
Status decoder

What Your BS&A Permit Status Means

Application submitted The Township received the record but may not have completed intake review.
Incomplete A required field, plan, signature, license, worksheet or outside approval is missing.
Plan review Building, zoning or an applicable trade reviewer is examining the documents.
Corrections required Revise every affected sheet and upload the response under the original application.
Fees due Pay the listed application, permit, review, registration or bond charges.
Issued Construction may begin within the approved scope and permit conditions.
Inspection requested The request was submitted; verify the accepted date and inspection type.
Inspection failed Correct all listed items and keep the work visible before requesting reinspection.
Expired Stop work and contact Building about renewal or a new application.
Finaled or closed Save the record and verify that every separate trade and zoning permit is also complete.
Permit history and FOIA

Search BS&A First, Then Request Missing Township Records

Search the public BS&A record

Use the address, parcel number or permit number to find permits and inspection results.

Check every related permit

A project can have separate Building, electrical, mechanical, plumbing, fence, sidewalk and zoning records.

Verify final inspection

An issued permit does not prove completed construction. Look for the final approval and closure status.

Submit a focused FOIA request

Describe the property, permit type, date range and exact records needed rather than requesting the entire Township file.

Review the cost notice

The Township can charge for research, duplication, redaction, plan copies, storage media, postage and other allowed costs.

Copy paper

$0.03 per sheet

Township FOIA schedule effective July 7, 2025.

16 × 24 plan copy

$2 per sheet

Other sizes or outside reproduction may differ.

General research

$30.45 per hour

Based on the lowest-paid employee capable of the work.

Postage and media

Actual cost

Applies when needed to fulfill the request.

Search Permits and Inspection Results Open Township FOIA

Troubleshooting

Fix Common Shelby Township Permit Problems

Problem
Likely reason
Next action
Online application cannot continue
Property, permit type or applicant account is incorrect
Use the correct homeowner or contractor route and verify the parcel
Application remains incomplete
Missing plot plan, construction plans, signature, license or outside approval
Compare the upload against the project procedure sheet
Inspection option is unavailable
Permit is not issued, active or ready for that inspection stage
Check permit status and prerequisite documents
Gas inspection cannot be scheduled
Revision 06/2025 gas-sizing worksheet is missing or incomplete
Complete and upload the current Township worksheet
Inspector marks work not ready
Work, test, approved plans or access was incomplete
Correct readiness and expect the listed $75 charge when applicable
Garage footing inspection is blocked
Preliminary grade and location certificate is not approved
Submit the certificate early enough for Township review
Final Building inspection is blocked
Final grade, trade finals, special inspections or site work remains open
Build a complete closeout list before rebooking
Permit is close to 180 days
Little or no inspection activity has occurred
Contact Building before expiration and document reasonable progress
Township approves but HOA objects
Private deed restrictions or easement agreements are more restrictive
Review recorded restrictions and obtain private approval
Old permit is missing online
Address, parcel, permit number or historical indexing differs
Try multiple BS&A searches and submit a focused FOIA request
Ready-to-use scripts

Ask Township Staff a Question They Can Answer Quickly

Permit-route question
“I am planning [exact work] at [address and parcel ID]. Which Building, electrical, mechanical, plumbing, fence, tree or sidewalk permits are required?”
Plan-package question
“For [project type], how many plot plans and construction-plan sets are required, and which energy, grading or county documents must be submitted?”
Inspection question
“Permit [number] is ready for [inspection type]. Is the permit active, are all prerequisite worksheets approved and what must remain visible?”
Permit-clock question
“Permit [number] was issued on [date]. What inspection or renewal action is required before the initial 180-day period ends?”
Final project control

Shelby Township Permit Completion Checklist

  • Address and parcel ID confirmed
  • Subdivision restrictions checked
  • Easements shown on plot plan
  • Zoning route confirmed
  • Correct homeowner or contractor account used
  • Required plot-plan copies prepared
  • Construction drawings coordinated
  • Energy worksheet included
  • Contractor licenses verified
  • Tree and county approvals obtained
  • Gas-sizing worksheet completed
  • Application, permit and bond fees paid
  • Permit formally issued
  • 180-day date calendared
  • Approved documents kept on site
  • Work left visible for inspections
  • Grade certificates approved
  • Building and trade permits finaled
Township Hall map

Shelby Township Building Department at 52700 Van Dyke Avenue

Where to go: The Building Department is on the upper level of Township Hall. Published hours are 8:30 a.m.–5:00 p.m., Monday through Friday. Call 586-731-5969 before bringing large plan sets or original documents.
Official resources

Open the Exact Shelby Township Permit Resource

Frequently asked questions

Shelby Township Building Permit and Inspection FAQs

Where do I apply for a Shelby Township building permit?

Use the Township’s official BS&A route. Homeowners and contractors have separate application links on the Building Department website. Some supporting forms must be downloaded and uploaded or presented to the Building desk.

What is the Shelby Township Building Department phone number?

Call 586-731-5969 or email building@shelbytwp.org. The department is on the upper level of Township Hall at 52700 Van Dyke Avenue.

What are the Shelby Township Building Department hours?

The Township lists Building Department hours as 8:30 a.m. to 5:00 p.m., Monday through Friday.

How long is a Shelby Township permit valid?

Permits issued under the fee changes effective September 1, 2025 begin with an initial 180-day validity period. Contact Building before expiration to confirm renewal eligibility and fees.

Does a shed under 200 square feet need a permit?

A qualifying detached residential accessory building of 200 square feet or less does not require a Building permit, but the property owner must obtain a Zoning Compliance Permit and provide the required plot-plan information.

How do I schedule a Shelby Township building inspection?

Use the official online inspection-request link connected to BS&A. Confirm that the permit is issued and active, all prerequisite documents are approved and the work is fully ready before submitting.

Why can’t I schedule my generator or tankless water-heater inspection?

The Township requires its Revision 06/2025 Gas Pipe and Gas Meter Sizing Worksheet for gas piping, tankless water heaters, generators, pool heaters and tankless or combination boilers before an inspection can be scheduled.

How much is a Shelby Township trade permit?

The September 2025 electrical, mechanical and plumbing schedules list a $75 minimum permit fee, a $50 application fee and a $2 online application fee, plus applicable equipment, circuit, fixture, plan-review and registration charges.

Can a Shelby Township homeowner pull their own permit?

A qualifying homeowner can use the homeowner permit route and sign the responsibility affidavit. The homeowner accepts responsibility for the work, inspections and code compliance and cannot use the exemption to evade contractor licensing requirements.

How do I find old Shelby Township permits and inspection results?

Start with the Township’s public BS&A permit and inspection-result search. For files not available there, submit a focused Township FOIA request using the address, parcel number, permit type and date range.

Independent guide and freshness

Source and Accuracy Note

Building-Department.org is an independent guide and is not the Charter Township of Shelby, BS&A Software or the State of Michigan. Applications, fees, inspections, code decisions and permit issuance must be completed through official government systems.

This guide was checked against the Shelby Township Building Department, official BS&A homeowner and contractor routes, inspection and payment links, September 2025 fee schedules, current code list, permit forms, gas-sizing notice, single-family procedure, accessory-building procedure, demolition procedure, Planning and Zoning page and Township FOIA schedule.

Last reviewed: July 22, 2026.

Forms, fees, code editions, staff assignments, permit routes and inspection procedures can change. Confirm live requirements before paying, ordering plans, beginning work or allowing a permit to approach expiration.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.