Macomb Township permit action guide

Apply, Track, Inspect and Close a Macomb Township Building Permit

Macomb Township uses BS&A Online for permit applications, fee payments and public permit records. Licensed plumbing, mechanical and electrical contractors need an online account and Township PIN before submitting trade permits.

This guide gives homeowners, builders and business owners the exact permit route, current July 2026 fees, plan requirements, local garage and pool rules, inspection timing, zoning dependencies and final occupancy steps.

BS&A application, payment and public-record route
Current permit, plan-review, bond and reinspection fees
Project-specific plans, inspections and correction steps
Macomb Township permit moving through property, plan and inspection review An animated application moves from a plot plan through zoning, building review and permit issuance before receiving final inspection approval. PLOT PLAN ADDRESS + SETBACKS PROPERTY PLANS PERMIT BS&A REVIEW APPLICATION FINAL INSPECTION PASSED
📌
Current July 2026 update Macomb Township’s fee schedule was revised July 1, 2026. Building-permit applications were revised April 29, 2026, and several trade-permit forms were updated in July 2026. Use the live Township invoice rather than an older saved fee sheet.
Start here

Choose the Exact Macomb Township Task

Open the Route That Matches Your Project

Each panel gives the first practical step and the main document risk.

New house

Prepare a signed and sealed plot plan, complete blueprints, energy-code documents, soil-erosion approval and applicable trade permits. New plot plans are submitted electronically to plotplannew@macomb-mi.gov.

Residential addition

Submit two plot plans and two construction-plan sets showing the foundation, floor plans, wall sections, elevations, braced walls, trusses and energy compliance. A soil-erosion permit is required when the project is within 500 feet of a watercourse or includes a basement below the addition.

Basement finish

Submit two plan sets showing ceiling height, insulation, draft stopping and emergency egress. Rough trade inspections come before rough building, insulation and final inspections.

Garage, shed or gazebo

Use the accessory-building checklist. Provide two plot plans and two construction-plan sets. Confirm parcel size, setbacks, maximum permitted area, height and foundation before ordering the structure.

Fence

Show total length, individual runs, height, type and pool-barrier status on two plot plans. The Township arranges a grade check before processing the permit.

Pool, spa or hot tub

A pool containing 24 inches or more of water requires building and electrical permits. Add a mechanical permit when a heater is installed. In-ground projects can also require soil-erosion review and a $1,000 bond.

Commercial project

Obtain Planning and Engineering approvals before building review. Submit coordinated site, architectural, structural, electrical, plumbing and mechanical plans sealed by Michigan design professionals.

New business or tenant

Obtain Certificate of Zoning Compliance approval before establishing a new commercial, industrial or office use. Interior construction, change of occupancy and final approvals may require separate permits and inspections.

Official contact panel

Macomb Township Building Department Contact Information

Building Department 586-992-0710 ext. 1 Permits, plan review and inspections
Building email building@macomb-mi.gov Include address and permit number
Office address 54111 Broughton Road 1st Floor, Macomb, MI 48042
Office hours Monday–Friday 8:00 AM–4:30 PM
Inspector question windows 8:00–8:30 AM Also 4:00–4:30 PM
Fire inspections 586-286-0027 Fire alarm and suppression finals
Planning submissions PlanDropBox@macomb-mi.gov Planning application packets
New residential plot plans plotplannew@macomb-mi.gov Signed and sealed plot plans
Before contacting staff: Have the project address, subdivision and lot number, parcel number, property owner, permit number, contractor name and exact inspection or review question ready.
Township-versus-county check

Macomb Township Handles the Building Permit—County Agencies May Handle Other Approvals

Macomb Township commonly handles

  • Building permits
  • Electrical permits
  • Mechanical permits
  • Plumbing permits
  • Construction inspections
  • Certificate of Zoning Compliance
  • Certificate of Occupancy requests
  • Local code enforcement

Another agency may handle

  • County soil-erosion permits
  • County road or approach permits
  • Septic permits for unsewered parcels
  • County-drain requirements
  • State highway access permits
  • Township water and sewer taps
  • Subdivision private restrictions
  • Utility-company approvals
Do not confuse Macomb Township with Macomb County. A Macomb postal address does not automatically prove Township jurisdiction. Search the property in the official BS&A portal before submitting.
Permit decision table

Which Macomb Township Permit Fits the Work?

Project
Start with
Additional requirement
New single-family home
Building permit
Plot-plan review, energy documents, soil erosion, utilities and trade permits
Home addition or structural alteration
Building permit
Two plot plans, two plan sets and applicable electrical, plumbing and mechanical permits
Basement finish
Building permit
Egress, ceiling height, insulation, draft stopping and trade permits
Electrical, HVAC, gas or plumbing
Trade permit
Licensed contractor account and Township PIN for online contractor filing
Garage, shed, pole barn, pergola or gazebo
Accessory-building permit
Plot plans, construction details, zoning setbacks, lot size and foundation
Fence
Fence permit
Plot plan, grade check, pool-barrier identification and final inspection
Pool or spa
Building permit
Electrical permit, mechanical permit for heater, plot plan, bond and barrier
Deck
Deck permit
Footings, framing, stairs, guards, handrails and property setbacks
New commercial building or addition
Planning and building review
Sealed plans, site approval, Engineering, DPW, soil erosion, fire and accessibility
New commercial, industrial or office use
Zoning compliance
Interior-finish permit, change-of-use inspections and occupancy approval when applicable
BS&A application workflow

Apply Online in Seven Clear Steps

Search and select the correct property

BS&A allows searches by address, parcel number or owner name.

Stop when: The property does not appear under Macomb Township. Confirm jurisdiction before continuing.

Choose the exact permit type

Select building, electrical, mechanical, plumbing or the specific project category shown in the portal.

Scope example: Finish 900-square-foot basement with bedroom egress, bathroom, electrical and HVAC alterations.

Enter applicant and notification information

Verify the homeowner, contractor and contact details. Choose the parties who should receive status-change emails.

Trade contractors: Licensed and registered electrical, mechanical and plumbing contractors need an account and PIN.

Estimate the correct fee quantities

Select the fee items and quantities that match the work. The Township checks the application before issuing the final invoice.

Do not guess low: Construction valuation includes the value of the complete permitted work.

Attach plans and supporting documents

Upload readable plot plans, construction drawings, licenses, insurance, contracts and outside approvals required for the permit type.

File names: Use Address – Site Plan, Address – Architectural Plans and Address – Contractor Documents.

Save the confirmation and monitor View My Activity

A successful submission produces a confirmation screen. Review portal activity for comments, approvals and invoices.

Payment: Processed permit invoices can be paid from View My Activity or the Building Department payment service.

Confirm formal issuance before starting work

An application, estimated fee or review approval is not the issued permit.

Before construction: Verify the permit number, issued status, approved plans and required inspections.
Application readiness

What to Prepare Before Opening BS&A

Property and applicant

  • Project address
  • Subdivision and lot number
  • Parcel number
  • Owner’s legal name
  • Applicant phone and email
  • Detailed scope

Plans and project data

  • Plot plan
  • Floor plans
  • Building elevations
  • Foundation details
  • Wall and framing sections
  • Construction valuation

Contractors and approvals

  • Builder or trade license
  • Driver’s-license information
  • Insurance certificates
  • Workers’ compensation proof
  • Soil-erosion permit
  • Planning or Engineering approval
A mortgage survey is not accepted as the Township plot plan. The official FAQ says applicants should request the approved plot plan from the Building Department. Older records may be stored off-site, so request them early.
New-home document board

Additional Items for a New Single-Family Home

Required plan package

  • Signed and sealed plot plan showing adjacent-lot setbacks
  • Property address and finished first-floor elevation
  • Foundation and floor plans
  • Wall sections and elevations
  • Braced-wall plans
  • Energy-code compliance report
  • Heat plan with Manual J and S calculations before rough mechanical inspection
  • Sealed truss and I-joist drawings before rough building inspection

Unplatted-parcel checks

  • Septic approval when municipal sewer is unavailable
  • Culvert or approach permit when applicable
  • Notice of Address from Township Planning
  • Parcel Approval Notice from Assessing
  • County soil-erosion approval
  • Township water and sewer approvals
New-home application fee: $200. The July 2026 fee schedule says this non-refundable application fee is credited toward the permit fee when the permit is issued.
Local project rules

Accessory Building, Fence and Pool Requirements

Project
Township guidance
Critical action
Accessory-building documents
Two plot-plan copies and two construction-plan or brochure copies
Show existing buildings, septic system, property lines, section and foundation
Accessory-building location
Detached structures belong in the rear yard and cannot occupy utility or dedicated easements
Have Zoning confirm exact setbacks before ordering the structure
Small residential parcels
Certain listed districts on lots of 10,000 sq. ft. or less allow one garage up to 900 sq. ft. and one other accessory building up to 150 sq. ft.
Confirm the parcel’s zoning district and area
Accessory-building height
Detached accessory buildings on the listed small parcels are limited to 12 feet
Show the Township-defined height measurement on elevations
Detached structure foundation
Structures 600 sq. ft. or less use a 24-inch ratwall and slab detail; garages over 600 sq. ft. require a 42-inch footing
Request open-trench inspection before concrete
Fence processing
Water Department grade check takes approximately two to three days; the handout allows seven to ten working days for the complete permit process
Do not install until the permit is issued
Fence construction
No pointed tops; finished side faces outward; no fence closer than 3½ feet to another fence
Identify the property lines and request final inspection
Pool permit threshold
Building and electrical permits are required at 24 inches or more of water; heater adds a mechanical permit
Include pool, equipment, cables, easements, barrier and setbacks on the plot plan
Pool separation
Pool water edge must be at least 10 feet from a building; the handout allows a spa at least five feet from the main structure
Dimension the pool, deck and equipment separately
Pool bond
$250 above-ground pool bond; $1,000 in-ground pool bond
Budget the refundable bond separately from permit and trade fees
Accessory-building handout error: The February 2026 Township PDF contains inconsistent written and numeric wording for one side/rear setback. Do not rely on that line alone—ask Zoning to confirm the exact setback for the parcel.
Basement workflow

Basement Finish Inspection Order

Trade permits issued
Rough electrical, plumbing and mechanical
Rough building
Insulation and ceiling grid when required
Final trade inspections
Final building inspection
Bedroom or habitable-space warning: Show required emergency egress, ceiling height, insulation and draft stopping on the submitted plans. Do not frame the entire basement before confirming the approved layout.
Roof permit guidance

Residential Re-Roof Rules Updated April 2026

Permit required

The Township FAQ states that residential roof replacement requires a building permit.

Published roof fee: $100 residential.

Tear-off triggers

Existing roofing must be removed when there are two or more roof-covering applications or when the existing covering is water-soaked or deteriorated.

Ice-barrier rule

The Township handout requires the ice barrier to extend from the roof edge to at least 24 inches inside the exterior wall line.

Planning before building

Commercial and Land-Development Projects Start With Planning

Planning applications include

  • Site-plan review
  • Special land use
  • Site condominium review
  • Subdivision review
  • Planned unit development
  • Zoning variance
  • Rezoning
  • Address assignment

Planning submission method

  1. Complete the correct application and checklist.
  2. Create PDFs of the application, plans and supplemental documents.
  3. Include a copy of the fee check.
  4. Email the package to PlanDropBox@macomb-mi.gov.
  5. Deliver or mail the original check to Township Hall.
  6. Wait for confirmation of a complete submission.
Pre-application meetings are encouraged. Contact Planning before paying for a complete commercial or subdivision plan set, especially when the project involves a new use, special land use, grading or Township engineering.
Commercial plan gate

Documents Required Before Commercial Building Review

Township approvals

  • Planning Commission approval letter
  • Engineering site-plan approval
  • Township DPW construction permit
  • Water and sewer tap permits
  • Assessing master-deed approval when applicable

Outside approvals

  • County soil-erosion permit
  • County road or MDOT approach permit
  • Soil report
  • Structural calculations
  • Special-inspection statement

Construction plans

  • Site and architectural
  • Structural
  • Electrical
  • Plumbing
  • Mechanical
  • Energy compliance
  • Accessibility plan
Commercial drawing rules: The April 2026 checklist requires two coordinated plan sets, one consistent sheet size no larger than 24 × 36 inches, no half-size drawings and Michigan design-professional seals.
Current code framework

Construction Codes Enforced by Macomb Township

Commercial building 2021 Michigan Building Code Effective April 9, 2025
Residential 2015 Michigan Residential Code With Michigan Part 5 amendments
Commercial plumbing 2021 Michigan Plumbing Code Effective March 12, 2024
Commercial mechanical 2021 Michigan Mechanical Code Effective March 12, 2024
Fuel gas 2021 International Fuel Gas Code Township-listed edition
Electrical 2023 Michigan Electrical Code / NEC Effective March 12, 2024
Existing buildings 2021 Michigan Rehabilitation Code Effective April 9, 2025
Commercial energy 2021 Michigan Commercial Energy Code Effective April 22, 2025

Open Macomb Township’s current code sheet

July 2026 fee board

Macomb Township Building Permit Fees

Fee item
Current Township amount
Important detail
Online application charge
$2
Added to online filings
New single-family application
$200
Non-refundable but credited toward issued permit
Commercial, industrial or multi-family alteration application
$150
Application fee only
New commercial, industrial or multi-family application
$300
Permit and plan-review fees are additional
Residential roof
$100
Commercial or industrial roof is $200
Deck
$150
Plan review and trade work may be additional
Above-ground pool
$100
$250 pool bond is separate
Free-standing hot tub or spa
$100
Electrical and mechanical permits may apply
Residential demolition
$150
Commercial demolition is $250
Fence
$75
Grade check and final inspection required
Concrete, paver or patio
$100
Township zoning fee
Shed, pergola or gazebo under 200 sq. ft.
$100
Larger structures use building-permit calculations
Residential project plan review
$50
Applies to listed alterations, additions, decks, pools, fences and similar projects
New single-family plan review
$150
Plot-plan engineering review is separate
Commercial plan review
25% of building fee
$200 minimum
New residential plot-plan engineering review
$350
$500 for a scattered parcel
Work started without permit
$150
Other permit and enforcement costs can still apply
Locked-out inspection
$50
Provide safe and reliable access
Work not ready
$75
Check the inspection stage before calling
Additional reinspection
$75
First reinspection of original violations has no charge

Valuation-based building fees

Projects without a specific flat fee use the Township’s graduated construction-value table.

  • $0–$1,000: $100
  • $1,001–$10,000: $100 plus $10 per $1,000 above $1,001
  • $10,001–$100,000: $190 plus $6.50 per $1,000 above $10,001
  • Higher brackets use separate formulas

Why the live invoice can be higher

  • Plan review
  • Engineering review
  • Trade permits
  • State or consultant charges
  • Project bonds
  • Plan revisions
  • Special inspections
  • Outside-agency approvals
Application deadline: An application fee can be forfeited 180 days after filing when the application has not been pursued in good faith or a permit has not been issued. A written extension with justifiable cause may be available.

Open Official July 2026 Fee Schedule

Inspection action board

Schedule and Pass Macomb Township Inspections

Permit issued
Correct work stage completed
Approved plans kept on site
Request inspection on time
Read approval or correction
Pass final and close permit

Residential notice

24-hour notice is required.

Call 586-992-0710 ext. 1 with the permit number, address and inspection type.

Commercial scheduling

Commercial inspections requested before 3:30 PM are normally scheduled for the next day.

Scheduling is not a guarantee of approval.

Inspector questions

Residential guidance lists inspectors in the office:

8:00–8:30 AM
4:00–4:30 PM

Have ready

  • Issued permit number
  • Correct inspection type
  • Approved Township plans
  • Work completed for the stage
  • Concealed work left exposed
  • Safe access to the site

Avoid reinspection charges

  • Read prior correction notes
  • Complete every cited item
  • Coordinate all required trades
  • Provide ladders or access where needed
  • Do not call before work is ready
  • Prevent locked gates or buildings
Approved plans must remain on site. Commercial guidance also requires safe MIOSHA-compliant inspector access. An unsafe site can cause the inspection to stop and may create a reinspection charge.
Residential inspection sequence

Typical New-Home and Addition Inspections

Stage
Common inspection
Do not proceed until
Foundation
Basement footing, garage footing and backfill when applicable
Footing and waterproofing stages are approved
Underground and slab
Drain tile, plumbing and sand/subbase inspections
Underground work is approved before covering or concrete
Rough trades
Electrical, plumbing and mechanical rough inspections
All concealed trade work is approved
Rough building
Framing, braced walls, structural connections and required fire blocking
Trade roughs and structural documents are complete
Envelope
Flashing, weep holes, concealed insulation and insulation
Required materials remain visible
Final trades
Final electrical, plumbing and mechanical
Fixtures and systems are complete and operational
Final building
Building final
Address is permanently affixed and required utility/site items are complete
Commercial closeout

Final Building Inspection Comes After Other Final Approvals

Before final building

  • Final plumbing approved
  • Final electrical approved
  • Final mechanical approved
  • Fire alarm approval complete
  • Fire suppression approval complete
  • Third-party summary report accepted
  • Engineering and site work complete
  • Approved plans followed

Completion document

Certificate of Completion: May be used for a shell or white-box project with no approved use.

Temporary Certificate of Occupancy: Requires trade, fire, Engineering and life-safety approval.

Permanent Certificate of Occupancy: Requires all permits and site work to be complete.

Permit lifespan

Keep the Permit and Application Active

Building permits

  • Initially valid for 180 days.
  • Can be renewed for one-year periods with continuing reasonable progress.
  • Work cannot be suspended or abandoned for 180 days.
  • Annual renewal is 50% of the original permit fee, up to $500.

Trade permits

  • Become invalid when work does not begin within six months.
  • Can close when no inspection is requested and conducted within six months.
  • Closed trade permits cannot be refunded or reinstated.
  • Permits and fees are non-transferable.
Before a deadline: Check the permit record, confirm the most recent inspection date and submit any renewal or extension request in writing before continuing work.
Permit search and records

Find an Old, Open or Expired Macomb Township Permit

Open the Macomb Township BS&A page

Select Building Department Record Search.

Search by permit number first

Use the number from an invoice, permit card, inspection report or contractor document.

Try address and parcel searches

Use the base property address or parcel number when the permit number is unavailable.

Check every permit connected to the project

A building project may have separate electrical, mechanical, plumbing, zoning and occupancy records.

Request stored plans or plot plans early

The Township FAQ warns that some plot plans are in storage and may take several days to retrieve.

Contact Building when the record is incomplete

Email building@macomb-mi.gov with the address, approximate year, owner or contractor and document requested.

A permit number is not proof of final approval. Verify the inspection history and final or closed status for the building permit and every associated trade permit.
New business and occupancy

Obtain Zoning and Occupancy Approval Before Opening

Certificate of Zoning Compliance

Required before establishing a new use in a commercial, industrial or office zoning district.

  • Describe the proposed business and use.
  • Identify the building or tenant space.
  • State whether interior or exterior work is proposed.
  • Complete interior-finish permits when required.

Certificate of Occupancy request

The Township request form requires the applicable boxes to be cleared:

  • Certificate of Zoning
  • Building approval
  • Electrical approval
  • Mechanical approval
  • Plumbing approval
  • Engineering final bond release
  • Fire Department approval
Fee-document difference: The July 2026 zoning-compliance application lists $75 when an interior-finish permit is required and $250 when no interior-finish permit is required. The general fee schedule separately lists a $75 zoning-compliance fee excluding inspections. Confirm the correct live invoice for the exact business setup.
Common delay prevention

Ten Macomb Township Permit Problems to Avoid

  1. Applying to Macomb County instead of Macomb Township.
  2. Using a mortgage survey instead of the approved Township plot plan.
  3. Submitting a trade permit without the contractor account and PIN.
  4. Leaving out required electrical, plumbing or mechanical permits.
  5. Starting work before formal permit issuance.
  1. Ignoring a Planning, Engineering, soil-erosion or road approval.
  2. Ordering an accessory structure before confirming the parcel-specific zoning limits.
  3. Covering work before inspection.
  4. Calling for an inspection when the work is not ready or inaccessible.
  5. Assuming one building final closes all trade and occupancy records.
Ready-to-use communication

What to Say When Contacting Township Staff

Permit requirement:
“I am planning [exact work] at [address, subdivision and lot]. Which building, zoning, Engineering and trade permits are required, and which plans should I submit?”
Trade-contractor access:
“My BS&A account is registered under [email/company]. I need the Township PIN or account connection required to submit a [electrical/mechanical/plumbing] permit.”
Plan correction:
“Permit application [number] received comments dated [date]. I uploaded revised drawings and a numbered response showing the sheet and detail for every correction.”
Open permit:
“I found permit [number] at [address], but it does not appear closed. Which inspection, fee, plan or outside approval remains outstanding?”
Final completion checklist

Do Not Treat the Project as Finished Until These Are Complete

  • Macomb Township jurisdiction confirmed
  • Correct permit types identified
  • Approved plot plan obtained
  • Planning approval complete
  • Engineering approval complete
  • County approvals obtained when required
  • Contractors licensed and registered
  • Complete plans submitted
  • Review corrections resolved
  • Fees and bonds paid
  • Permit formally issued
  • Approved plans kept on site
  • Inspections requested on time
  • Failed items corrected
  • All trade permits finalized
  • Occupancy document obtained when required
Office map

Macomb Township Building Department Map

Address: 54111 Broughton Road, 1st Floor, Macomb, MI 48042.
Hours: Monday–Friday, 8:00 AM–4:30 PM.
Call 586-992-0710 ext. 1 before making a special trip or delivering large plan sets.
Official resource library

Open the Correct Macomb Township Portal, Form or Checklist

Frequently asked questions

Macomb Township Building Permit FAQs

Where do I apply for a Macomb Township building permit?

Use the Macomb Township BS&A Online portal. Search the property, choose the permit type, enter the work description and applicant information, estimate fee quantities and attach required plans or documents.

How do licensed trade contractors apply online?

Licensed and registered plumbing, mechanical and electrical contractors need a BS&A account and Township PIN before submitting online trade-permit applications.

How do I schedule a Macomb Township inspection?

Call the Building Department at 586-992-0710, extension 1. Residential inspection guidance requires 24-hour notice. Commercial inspections requested before 3:30 PM are normally scheduled for the next day.

Can I use a mortgage survey as my plot plan?

No. The Township FAQ says a mortgage survey cannot replace the approved plot plan. Contact the Building Department to request the Township plot-plan record; older files may take several days to retrieve.

How much is a Macomb Township roof permit?

The July 2026 fee schedule lists $100 for a residential roof permit and $200 for a commercial or industrial roof permit.

How much is a fence permit?

The current Township fee is $75. The fence application requires plot plans, a Township grade check and a final inspection.

Does a swimming pool need more than one permit?

A pool containing 24 inches or more of water requires building and electrical permits. A mechanical permit is also required when a pool heater is installed.

When does a Macomb Township permit expire?

Building permits are initially valid for 180 days and can be renewed when reasonable progress continues. Trade permits can become invalid or close when work or inspections do not occur for six months.

What is required before a commercial Certificate of Occupancy?

The Township request form requires the applicable zoning, building, electrical, mechanical, plumbing, Engineering and Fire Department approvals before a temporary or final certificate request is submitted.

How do I find an old or open permit?

Use Building Department Record Search in Macomb Township BS&A. Search by permit number first, then by property address or parcel. Review all related building and trade records and contact building@macomb-mi.gov when an older document is missing.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not Macomb Township.

This page was checked against the official Macomb Township Building Department, BS&A portal, July 2026 fee schedule, April and July 2026 permit forms, current code sheet, residential and commercial inspection guides, project-specific requirement PDFs, Planning application packets and Macomb County permit resources.

Last verified: July 22, 2026.

Forms, fees, code editions, permit procedures, staff contacts, review requirements and inspection availability can change. Confirm time-sensitive information with Macomb Township before filing, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.