Broward County Building Department 2026

Broward County permit action guide

Choose the Correct Broward Permit Office, Submit the Right ePermit and Clear Every Hurricane-Zone Inspection

Broward County does not issue every building permit in Broward County. The County Building Code Division primarily handles the Broward Municipal Services District—unincorporated Broward—and locations served under an interlocal or contract arrangement.

This guide separates County permits from city permits, explains BMSD ePermits and ePermits OneStop, shows the in-person Owner-Builder route, and organizes current forms, fees, Notice of Commencement rules, HVHZ documents, inspections and permit closeout into simple steps.

County-versus-city jurisdiction check
Current 2026 Uniform Permit Application
HVHZ, NOC and inspection readiness
Broward County permit route A county and city jurisdiction map moves into electronic permit upload, hurricane-zone review and final inspection. COUNTY OR CITY? ? EPERMIT REVIEW ACCEPTED PERMIT PDF HVHZ REVIEW FINAL INSPECTION CLOSED
!
Important corrections to the old article Broward County’s current Building Code Division office is at 2307 West Broward Boulevard, Suite 300, Fort Lauderdale. The County uses its BMSD ePermits system—not the generic Accela portal shown in the old page. Owner-Builder permits are not eligible for BMSD ePermits.
2026
Use the current Uniform Building Permit Application Broward’s current form was revised January 8, 2026 and became effective March 9, 2026. The County states that previous versions will not be accepted.
Start here

Choose the Broward Permit Task You Need

Broward Permit Route Finder

Select the situation. The result gives the correct official first step.

Jurisdiction first

Determine Whether Broward County or a Municipality Issues the Permit

Use the County Building Code Division when

  • The property is in the Broward Municipal Services District.
  • The location is in unincorporated Broward County.
  • The County confirms it serves the location under an interlocal agreement.
  • The official BMSD ePermit system accepts the parcel.
?

Contact the city when

  • The property is inside an incorporated municipality.
  • The municipal building department issues the master building permit.
  • The address appears on the Countywide Building Official Contacts list.
  • A city permit is needed before associated County approvals.
Confirm property location
Identify county or city permit office
Check zoning and environmental review
Open the correct permit portal
Submit plans and approvals
Inspect and close
Do not submit the same master permit to the County and a city. City customers may use ePermits OneStop to coordinate associated County approvals, but the municipality may still control the main building-permit application.
Official contact panel

Broward County Building Code Division Address, Phone and Hours

Main Building line 954-765-4400 Permit status and department assistance
Customer Service 954-831-4000 General inspection and service assistance
Inspection IVR 954-497-1320 Schedule, cancel or obtain results by phone
Email building@broward.org Include permit number and property address
Office hours 8:00 AM–3:30 PM Monday through Friday
Inspector questions 7:30 AM–8:30 AM Monday through Friday
Office Riverbend Corporate Park 2307 W Broward Boulevard, Suite 300
City building contacts Open directory Confirm the municipality before filing
Best email subject: Permit [number] — [job address] — [specific question]. Attach only the document being discussed and name it clearly.
Permit decision table

Match the Project to the Correct Broward Permit Route

Project
Start with
Additional review to check
New house, duplex or residential addition
Structural building permit
Zoning, flood zone, drainage, environmental review, energy, utilities and impact fees
Commercial construction or alteration
Commercial building permit
Development review, fire, accessibility, occupancy, impact/concurrency fees and private-provider requirements
Roof replacement
Roofing application packet
HVHZ roof assembly, product approval, deck attachment and hurricane-mitigation affidavit
Windows, exterior doors or shutters
Windows and doors packet
HVHZ product approval, design pressures, opening dimensions and anchorage
Fence
Fence permit packet
Survey, zoning, easements, visibility triangle and environmental approval
Pool or spa
Swimming-pool permit
Barrier, electrical bonding, plumbing, zoning, flood and environmental approvals
Generator
Generator application packet
Electrical, gas, mechanical, flood elevation, setbacks and manufacturer specifications
Air-conditioner replacement
Mechanical permit
Uniform data form, electrical work, equipment anchorage and NOC threshold
Electrical, plumbing or mechanical work
Separate trade application
Parent master permit, contractor registration and trade inspection sequence
Work completed without permits
After-the-fact permit
Double fees, concealed-work verification, engineer letters and code-compliance case requirements
BMSD ePermit workflow

Submit an Eligible Broward County ePermit in Eight Clear Steps

Confirm the property is eligible for BMSD ePermits

Verify that the County Building Code Division has permitting jurisdiction. Owner-Builder permits, Fort Lauderdale-Hollywood International Airport permits and certain interlocal-agreement locations may require another submission route.

Do first: Confirm jurisdiction before creating an account or uploading plans.

Register the contractor with Broward County

The qualifier’s license must be registered or the applicant must hold an eligible Broward credential. General liability and Workers’ Compensation or exemption records must remain current.

Use the current Uniform Permit Application

Complete one application for the correct trade and project scope. Include the job address, folio number, flood zone, job value, owner, contractor, design professional and description of work.

Prepare separate, readable files

Separate the application, plans, product approvals, calculations, affidavits, surveys and outside-agency approvals. Use consistent file names.

Suggested names: Permit-Application.pdf, Site-Plan.pdf, Architectural-Plans.pdf, Product-Approvals.pdf.

Create the BCS Master Permit application

Sign into Broward’s ePermits system, select Submit Application, choose BCS Master Permit and complete each required field.

Upload documents and select a supplemental file

The current user guide says at least one uploaded document must be assigned the Supplemental Document type. Open each uploaded file before final submission.

Pay the application or initial plan-review fee

Building staff emails the master permit number and payment instructions when the application is accepted. The permit application processing fee is nonrefundable.

Monitor reviews and obtain formal issuance

Read correction notices, pay remaining fees and download the approved plans and permit card after approval. The County states that permits are not issued until applicable permit fees are paid.

Inspection preparation: Print approved documents and plans to scale for the job site.
Correction control

How to Upload Broward Plan Corrections Without Breaking the File History

Use the same document name

The BMSD electronic-permitting guide instructs applicants to replace a rejected document by uploading the corrected version with the same document name.

Example: If the rejected file is named plan.pdf, upload the corrected file as plan.pdf.

Do not start another master permit

Open My Application Status, select the existing application, choose Upload Docs and upload the new version.

Create a separate revision or change-of-plans request only when the project is already issued and the scope changes.

Review-control tip: Keep one correction log listing each comment, the response, the revised sheet and the revision date.
Application documents

Prepare the Permit Package Before Opening ePermits

Property and project

  • Correct job address
  • Tax folio number
  • Legal description
  • Flood zone and BFE
  • Present and proposed use
  • Detailed scope of work
  • Construction value
  • Owner contact information

Contractor and professionals

  • Qualifier name
  • Florida or County license
  • General liability insurance
  • Workers’ Compensation record
  • Architect or engineer information
  • Digitally signed plans when required
  • Private-provider documents if used
  • Owner authorization when applicable

Plans and approvals

  • Site plan or survey
  • Architectural plans
  • Structural details
  • Energy documentation
  • HVHZ product approvals
  • Drainage or environmental approvals
  • Fire review when required
  • Recorded NOC when triggered
Development review

Use ePermits OneStop When County Environmental Approval Is Part of a City Project

What ePermits OneStop does

Participating cities and Broward County use the centralized system to coordinate municipal permit applications with associated County permits, licenses and environmental approvals.

Open ePermits OneStop

Mandatory electronic review

Broward states that applications requiring Development and Environmental Review are accepted electronically through ePermits OneStop.

Do not deliver a paper DER package unless the reviewing agency specifically instructs you to do so.

City customers: A County approval does not replace the city’s master building permit. Check both the city record and the associated County review before starting construction.
High-Velocity Hurricane Zone

Design and Document the Project for Broward’s HVHZ Requirements

🏠

Roof systems

Submit the applicable roof assembly, Product Approval, fastening, deck attachment and manufacturer information.

🪟

Windows and doors

Match the approved product, design pressure, opening size, installation method and anchorage.

⚙️

Equipment

Show wind-rated anchorage for rooftop and exterior mechanical, electrical and generator equipment.

📐

Professional design

Signed and sealed calculations may be required where prescriptive HVHZ details do not cover the installation.

Current code framework: Broward’s Board of Rules and Appeals identifies the Florida Building Code, 8th Edition (2023), effective December 31, 2023, with Broward amendments and HVHZ provisions.
Notice of Commencement

Record and Submit the NOC Before the First Inspection

Current BMSD ePermit thresholds

  • Job value of $5,000 or more for applicable construction work.
  • $15,000 or more for air-conditioner replacement and repair.
  • A current certified copy of the recorded NOC is required.
  • Submit it before scheduling the first inspection.

Information to verify

  • Correct legal description and folio number
  • Project description matches the permit
  • Owner and contractor information is current
  • The document was recorded with Broward County
  • The complete recorded document was submitted
  • A copy is posted at the job site

Open the Official NOC Form

Current County fee structure

Understand the Broward Building Permit Fee Before Paying

Fee item
Current published amount or formula
Important limitation
Permit application processing
$125 nonrefundable
Added to applicable permit and plan-review fees
Minimum structural permit
$125
Permit is charged at the greater of minimum or valuation formula
Minimum roofing permit
$250
Separate plan-review, reinspection and surcharge fees may apply
Structural, electrical, mechanical or plumbing permit
3% of job value up to $9,999,999.99; 2.5% for job values over $10 million
County uses applicant value or RSMeans value, whichever is greater
First reinspection for same violation
$100
Subsequent reinspections may increase to $200, $300, $400 and higher
Permit extension
$50
Does not automatically replace an expired permit
Expired permit minimum
$125
A permit may be renewed within 180 days under the published renewal formula
Change of contractor
$75
Supporting withdrawal and replacement documents are still required
Plan-reviewer conference
$98 per hour, per discipline
Use when direct technical review is needed
Work without permits
Double fee
Code-enforcement, investigative and professional costs may also apply

Simple valuation example

For a permit with a $20,000 accepted job value:

3% × $20,000 = $600 base permit fee

Add the $125 application-processing fee, plan review, state surcharges and any project-specific approvals.

Do not estimate the final total from one percentage

The County may use RSMeans when it produces a higher job value. Separate trade permits, development review, impact fees, fire review, reinspections and certificates can change the total.

Open the Current Fee Schedule

Inspection scheduling

Request the Inspection Before the Broward Cutoff

Online request

Enter the permit number and Phone Access Code in the County inspection-request system.

Request inspection online

IVR request

Call 954-497-1320 to schedule, cancel or obtain inspection results.

Use the Phone Access Code—not the PIN.

Inspector questions

Contact inspectors between 7:30 AM and 8:30 AM for estimated inspection timing and technical questions.

Request timing
Published scheduling result
What to do
Before 3:00 PM
Scheduled for the next business day
Confirm the inspection code and make the site ready before submitting
After 3:00 PM
Scheduled for the second business day
Do not assume the inspection will occur the next morning
Cancellation
Request must be received by 9:00 AM on inspection day
Cancel promptly to avoid a possible reinspection or missed-inspection charge
Overtime inspection
Request directly with the Trade Chief at least 48 hours ahead
Do not submit overtime requests through the normal online inspection portal

Before requesting

  • Permit is issued
  • NOC is accepted if required
  • Correct inspection code selected
  • Work is complete for that stage
  • Required work remains visible
  • Approved plans are printed to scale

Before the inspector arrives

  • Permit card is available
  • Property is accessible
  • Gates are unlocked
  • Safe ladders are provided
  • Product approvals are available
  • Previous corrections are complete
Do not cover framing, roofing, wiring, plumbing, gas or insulation before the required inspection. Concealed work may have to be opened for verification.
Inspection code examples

Use the Correct Trade and Inspection Stage

Trade
Common stages
Closeout requirement
Building
Foundation, slab, framing, roof sheathing, insulation, drywall, windows, roofing and final
Building final after all prerequisite trade finals
Electrical
Underground, slab, rough, service, pool bond, equipment and final
Electrical final accepted
Mechanical
Underground piping, rough, fuel piping, hood, equipment and final
Mechanical final accepted
Plumbing and gas
Ground rough, top-out, water service, sewer, gas rough, backflow and final
Plumbing and gas finals accepted
Zoning and landscaping
Final site, landscape or zoning compliance when required
Required agency final completed before certificate issuance
Owner-Builder route

Owner-Builder Applicants Must Personally Appear

Owner-Builder permits are not eligible for BMSD ePermits. The property owner must personally appear, sign the application and provide state-issued identification.

Eligible property

The exemption can apply to a qualifying one-family or two-family residence, farm outbuilding or qualifying commercial work valued at no more than $75,000.

Own use or occupancy

The building must be for the owner’s own use or occupancy and not constructed or substantially improved for sale or lease.

One-year presumption

Sale or lease within one year after completion can create a presumption that the work was performed for sale or lease.

Direct supervision

The owner accepts direct onsite supervision and cannot appoint an unlicensed person to act as the contractor.

Worker responsibilities

Hiring workers can create tax, employment, Workers’ Compensation and personal-liability obligations.

Licensed trade work

Electrical, plumbing, gas, mechanical and specialty work may still require properly licensed contractors.

Read the Owner-Builder Affidavit

Contractor verification

Verify the License, Registration and Insurance Before the Permit Is Submitted

County verification checklist

  • Florida contractor license
  • Broward registration when required
  • Correct license scope
  • General liability certificate
  • Workers’ Compensation or exemption
  • Matching company name
  • Matching qualifier name
  • Current expiration dates

Registration documents

State contractors working in BMSD must provide the County verification form with the Florida license, liability insurance, Workers’ Compensation or exemption and state-issued identification.

Open State Contractor Registration

Contract protection: The contract should state who obtains each permit, who answers plan comments, who schedules inspections and which final documents must be delivered before final payment.
Permit and property records

Search the Permit First, Then Request Missing Plans or Open-Permit Research

Search by permit number

Enter the exact number from the permit card, invoice, inspection notice or contractor records.

Search by address

Complete the required address fields, but do not enter unit or suite information in the initial search.

Confirm County jurisdiction

The County records form applies to properties under Broward County Building Code Division jurisdiction. Annexed properties may have records with the municipality instead.

Request missing records

Use the official Building Records Request for permits, surveys, drawings or other documents not available through the public search.

Current records-request charges

  • $30 nonrefundable administrative fee.
  • Research fee begins at $50 per hour.
  • Additional copying or media charges can apply.
  • Extensive requests may require additional processing time.

Give the records team

  • Property address
  • Parcel or folio number
  • Subdivision, lot and block
  • Approximate permit year
  • Permit number if known
  • Exact document requested
Permit status help

What the Broward Permit Status Means

Unsubmitted The application exists in the account but has not been sent to Building staff.
Application received Staff is checking jurisdiction, applicant eligibility and initial completeness.
Plan review One or more disciplines or County agencies are reviewing the documents.
Corrections required Replace rejected files with corrected versions using the same document names.
Approved Approval may still be waiting for payment, NOC, contractor documents or formal permit issuance.
Issued Work may begin within the approved scope and subject to inspection requirements.
Expired Stop work and ask whether renewal is available. After 180 days, a new permit and current approvals may be required.
Final or complete Save the inspection results and confirm that each structural and trade permit is closed.
Open permit recovery

Old Permit Still Open? Build a Written Closeout Plan

Collect before contacting the County

  • Permit number
  • Property address
  • Original scope
  • Approved plans
  • Inspection history
  • Current photographs
  • Contractor information
  • Code-enforcement case number

Ask these questions

  • Is the permit expired?
  • Can it be renewed?
  • Which inspections remain?
  • Are current-code upgrades required?
  • Are revised plans required?
  • Are trade permits still open?
  • Is an engineer letter required?
  • What proves final closure?
Call and email scripts

Use These Short Scripts to Get a Clear Answer

Jurisdiction question
“I am planning work at [full address and folio number]. Can you confirm whether the property is in BMSD, a contracted County location or a municipal building-department jurisdiction?”
Permit requirement question
“The project is [exact work] at [address]. Which structural, electrical, plumbing, mechanical, zoning, environmental and HVHZ documents are required?”
Correction email
“Corrected files were uploaded for permit [number] using the same document names. The response identifies each reviewer comment and the revised page. Please confirm whether another discipline remains outstanding.”
Inspection question
“Permit [number], Phone Access Code [code]. I need inspection [type]. The work is complete, visible and accessible, and the approved plans are printed at the site.”
NOC question
“The project value is [amount] for [scope]. Can you confirm whether a recorded NOC is required and where the certified copy must be submitted before inspection?”
Open permit question
“Permit [number] at [address] is not final. Which inspection, trade permit, correction, fee or current-code document is required for closeout?”
Final project control

Do Not Consider the Broward Permit Complete Until These Items Are Verified

  • County or city jurisdiction confirmed
  • Current 2026 application used
  • Correct permit and trade categories selected
  • Contractor registration and insurance current
  • Zoning and environmental approvals complete
  • HVHZ product approvals coordinated
  • Flood information shown when applicable
  • Application-processing fee paid
  • Plan comments fully resolved
  • Permit formally issued
  • NOC recorded and accepted when required
  • Approved plans printed to scale
  • All structural and trade inspections passed
  • Certificate issued when required
  • Permit and sub-permits show final status
  • Final records saved by the owner
Office location

Broward County Building Code Division Map

Riverbend Corporate Park
2307 West Broward Boulevard, Suite 300
Fort Lauderdale, FL 33312
Office hours: Monday–Friday, 8:00 AM–3:30 PM
Official resources

Open the Correct Broward County Portal, Form or Search

Frequently asked questions

Broward County Building Permit Questions

Does Broward County issue every building permit in Broward County?

No. The County Building Code Division primarily serves the Broward Municipal Services District—unincorporated Broward—and locations served under contract. Incorporated cities generally operate their own building departments.

Where do I submit a Broward County building permit online?

Eligible BMSD permit applications are submitted through Broward’s ePermits system. City customers may use ePermits OneStop for participating municipal applications and associated County approvals.

Can an Owner-Builder apply through Broward ePermits?

No. The County’s Owner-Builder affidavit states that the owner must personally appear, sign the building-permit application and provide state-issued identification. Owner-Builder permits are not eligible for ePermits.

Which Broward Uniform Permit Application should I use?

Use the current application revised January 8, 2026 and effective March 9, 2026. Broward states that previous versions will not be accepted.

When is a Notice of Commencement required?

The current BMSD electronic-permitting guide identifies a recorded NOC for job values of $5,000 or more, or $15,000 or more for air-conditioner replacement and repair. Submit the certified recorded copy before the first inspection.

How much is a Broward County building permit?

The current County fee schedule lists a $125 nonrefundable application-processing fee, a $125 minimum base permit fee and a $250 minimum roofing fee. Structural and trade permit fees generally use 3% of job value up to $9,999,999.99 and 2.5% above $10 million, subject to County valuation and additional fees.

How do I schedule a Broward County inspection?

Use the online inspection-request page with the permit number and Phone Access Code, or call the IVR at 954-497-1320. Requests received before 3:00 PM are scheduled for the next business day under the published IVR instructions.

What happens when an inspection is requested after 3:00 PM?

The published IVR instructions state that requests received after 3:00 PM are scheduled for the second business day.

How do I correct a rejected ePermit document?

Open the existing application, choose Upload Docs and upload a new version using the same document name as the file being replaced. Do not create a duplicate master permit unless County staff directs you to do so.

How do I find old Broward County permit records?

Search the public permit system by permit number or address first. When plans or records are unavailable, submit the official Building Records Request with the property address, folio number, approximate year and exact documents needed.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not Broward County Government.

This page was checked against the Broward County Building Code Division, BMSD ePermits guide, ePermits OneStop, current 2026 Uniform Permit Application, current fee schedule, Owner-Builder affidavit, inspection instructions, contractor-verification guidance, records request and Broward Board of Rules and Appeals code resources.

Last reviewed: July 23, 2026.

Permit jurisdiction, forms, fees, inspection procedures and agency approvals can change. Confirm time-sensitive requirements with Broward County or the correct municipality before filing, paying or starting work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment